The aim is to remove copper from a pyrite cinder by optimizing the chlorination roasting process using re-sponse surface methodology (RSM) and the reaction mechanism of chlorination roasting based on thermodynamic calculation was discussed. A quadratic model was suggested by RSM to correlate the key parameters, namely, dos-age of chlorinating agent, roasting temperature and roasting time to the copper volatilization ratio. The results indi- cate that the model is well consistent with the experimental data at a correlation coefficient (R2) of 0.95, and the dosage of chlorinating agent and roasting temperature both have significant effects on the copper volatilization ratio. However, a roasting temperature exceeding 1170 ~C decreases the volatilization ratio. The optimum conditions for removing copper from the cinder were identified as chlorinating agent dosage at 5%, roasting temperature at i155.10 ℃ and roasting time of 10 min; under Such a conditiom a copper volatilization ratid of 95.16% Was a- chieved from the cinder. Thermodynamic calculation shows that SiO2 in the pellet plays a key role in the chlorine re-lease from calcium chloride, and the chlorine release reactions cannot occur without it.
LIU JianWEN Shu-mingCHEN YuLIU DanBAI Shao-junWU Dan-dan